
STS-92 - Wikipedia
STS-92 was a Space Shuttle mission to the International Space Station [1] (ISS) flown by Space Shuttle Discovery. STS-92 marked the 100th mission of the Space Shuttle and Discovery's 28th flight. It was launched from Kennedy Space Center, Florida, 11 October 2000. [2] Seats 1–4 are on the flight deck. Seats 5–7 are on the mid-deck.
STS-92 - NASA
2000年10月11日 · STS-92, during its 12-day mission to the International Space Station (ISS), completed all assigned objectives to install the Zenith Z1 Truss and the third pressurized mating adapter (PMA 3) for use as a docking port for subsequent shuttle missions.
STS-92 - 维基百科,自由的百科全书
迈克尔·洛佩兹-阿雷格里亚( Michael E. Lopez-Alegria ,曾执行 STS-73 、 STS-92 、 STS-113 、 联盟 TMA-9 以及 远征14号 任务),任务专家 威廉·麦克阿瑟 ( William S. McArthur ,曾执行 STS-58 、 STS-74 、 STS-92 、 联盟TMA-7号 以及 远征12号 任务),任务专家
STS-92 - 維基百科,自由的百科全書 - zh.wikipedia.org
sts-92 是歷史上第一百次穿梭機任務,也是發現號穿梭機的第二十八次太空飛行。
- [PDF]
STS-92 - NASA
STS-92 Mission Overview DISCOVERY DELIVERS FRAMEWORK FOR FUTURE SPACE STATION GROWTH Space Shuttle Discovery is poised to deliver the next in a series of major hardware components to the International Space Station (ISS) during the STS-92 mission as the new international facility receives its first framework structure to house
Spaceflight mission report: STS-92
Over the course of four spacewalks, two teams of spacewalkers and an experienced robot arm operator collaborated to install the so-called Z1 (Z for zenith port) truss structure on top of the U.S. Unity connecting node on the growing station and to deliver the third Pressurized Mating Adapter (PMA -3) to the ISS for the future...
Space Station 20th: STS-92 Resumes International Space Station ... - NASA
2020年10月14日 · Just three weeks before the first expedition crew took up residence aboard the International Space Station (ISS), assembly of the orbiting facility resumed during the STS-92 space shuttle mission. In contrast to STS-106, the previous flight to the station that focused on resupplying and outfitting the station’s interior, the main tasks of STS ...
STS-92 Fact Sheet - Spaceline
1999年12月27日 · STS-92 marked the fifth Space Shuttle flight to the International Space Station (ISS). Discovery docked to ISS at 1:45 p.m. EST on October 13, 2000. Astronauts Chiao and McArthur conducted the first spacewalk of the mission on October 15, 2000.
STS-92 - Encyclopedia Astronautica
STS-92 was a space station assembly flight to bring the Z-1 Truss (mounted on a Spacelab pallet), Control Moment Gyros, Pressurized Mating Adapter-3 (PMA-3) and two DDCU (Heat pipes) to the International Space Station.
STS-92 - SpringerLink
2019年3月24日 · STS-92 Mission Objectives. As flight ISS 3A, the primary objectives of STS-92 were as follows: Deliver the Z1 truss for installation on the zenith port of the Unity module. It would temporarily hold the first solar arrays when the P6 truss was delivered by STS-97 in December 2000. Deliver the third and final PMA.