SNAP-Magat inaugurates 8.5 MW Maris hydro - AboitizPower …
2017年11月6日 · Maris hydro utilizes the water coming from Magat hydro that goes into the Maris re-regulating dam located downstream of Magat, before flowing into the Maris Main (South) Irrigation Canal. Construction of the PHP2.15 billion run-of-river hydro plant took about two years.
Magat Dam - Wikipedia
Magat Dam is a large rock-fill dam in the island of Luzon in the Philippines. The dam is located along the Magat River, a major tributary of the Cagayan River. The construction of the dam started in 1975 and was completed in 1982. It is one of the largest dams in the Philippines.
NIA, SNAP switch-on MARIS Hydroelectric plant
2018年2月1日 · NIA Isabela - The National Irrigation Administration and SN Aboitiz Power-Magat, Inc. (SNAP-Magat) inaugurated the 8.5-megawatt (MW) Maris Main Canal Hydroelectric Power plant, January 26, at National Irrigation Administration (NIA) Dams and Reservoir Division.
SN Aboitiz Power Group | AboitizPower
Maris Hydro utilizes the water coming from the Magat River that goes into the Maris re-regulating dam located downstream of Magat, before flowing into the Maris Main (South) Irrigation Canal. The Maris Hydro project was proposed by SNAP-Magat’s operations and maintenance team under the company’s business creativity and innovation program.
Maris South Canal Hydro Electric Power Project
The Maris South HEPP is a 'run-of-river' plant located on one of the downstream canals of the Maris Reservoir. The station utilises 2 x 4.25 kW Kaplan turbines. Our scope of work included the construction of: Upstream and downstream cofferdams; Large intake and headrace structures
NIA, SN Aboitiz to Optimize MARIS Reservoir
2014年11月11日 · The MARIS reservoir is located in the downstream portion of the Magat Dam, one of the largest multipurpose dams in Asia, and is part of the NIA-Magat River Integrated Irrigation System (NIA-MARIIS). The initiative is seen to increase the storage capacity of the MARIS reservoir by up to eight million cubic meters that will primarily improve the ...
Maris Dam Bridge Map - Municipality of Ramon, Cagayan Valley …
Maris Dam Bridge is a bridge in Municipality of Ramon, Isabela, Cagayan Valley. Maris Dam Bridge is situated nearby to the pitch Open Court, as well as near the government office National Irrigation Administration - Magat River Management Project. Photo: Wikimedia, CC BY-SA 3.0.
SNAP-Magat to increase Maris reservoir capacity
2012年6月7日 · Under the terms of the MOA, SNAP-Magat will underwrite the cost of making specified repairs and upgrades to Maris Dam and Reservoir. The project is expected to contribute to increased operational efficiency of the 360MW Magat hydroelectric power plant which is owned and operated by SNAP-Magat.
8.5MW hydro power plant switched on in Isabela | Inquirer News
2018年1月25日 · Maris hydro utilizes water coming from Magat dam, that discharges into Maris’ re-regulating dam located downstream of Magat, before it flows towards an irrigation canal. It took two years to complete the PH2.15 billion run-of-river plant located in Ambatali village, making it “the newest addition to SNAP-Magat’s roster of host communities.”
SNAP-Magat to increase Maris reservoir capacity - NS Energy
2012年6月7日 · The Magat Maris Reservoir Optimization Project would increase the storage to 13.65Mm3 and undertake a number of repairs and upgrades to improve the safety of the Maris Dam. Under the terms of the MOA, SNAP-Magat will underwrite the cost of making specified repairs and upgrades to Maris Dam and Reservoir.
- 某些结果已被删除